Irrigation Water Management

Irrigation Scheduling Basics

1-Car Analogy


First Volkswagen's in the US

 

- This car has a 10 gallon gas tank (+ some reserve -> you can use the whole 10 gallons).
- As you drive, you get 30 miles per gallon.
- You average 20 miles of driving per day.


1) How far can you drive on a full tank before needing to refuel?

30 miles/gallon x 10 gallons/tank = 300 miles/tank


2) If you follow this practice, how many days between gas stops?

300 miles/tank ÷ 20 miles/day = 15 days/tank


3) If you refuel 10 days after fill-up, how much gas can you put in your tank without it overflowing?

10 days driving x 20 miles/day = 200 miles driven
200 miles driven ÷ 30 miles/gallon = 6-2/3 gallons used


4) Your room-mate, who drives with a lead foot, only manages to get 25 miles per gallon when borrowing your car. Your room-mate also drives 20 miles per day (when you are so benevolent as to make the car available). How long can your room-mate go between fill-ups?

25 miles/gallon x 10 gallons/tank = 250 miles/tank
250 miles/tank ÷ 20 miles/day = 12-1/2 days/tank


5) You get your car fitted with a new gas tank that has a capacity of 12 gallons (+ some reserve -> you can use the whole 12 gallons). How many days can you go between fill-ups?

30 miles/gallon x 12 gallons/tank = 360 miles/tank
360 miles/tank ÷ 20 miles/day = 18 days/tank


What's the analogy?

 car, fuel use  ==>  soil-plant-water system, water use
 gas tank  ==>  soil moisture reservoir
   + soil type (texture)
   + root zone
miles/day ÷ miles/gallon = fuel use (gallons/day)    ==>  water use (in/day) (ETc)
model of auto, driver, driving habits, driving route all change fuel use   ==>  crop, time of season, weather all change  water use
amount of fuel used   ==>  soil moisture depletion (SMD)
amount of fuel to add when refueling   ==>  soil moisture depletion (SMD) at time  of irrigation
 amount of fuel left  ==>  soil moisture content (SMC)
 size of fuel tank  ==>  available water holding capacity (AWHC)
maximum fuel use allowed to maintain a reserve to prevent running out of gas on the freeway   ==>  maximum allowed depletion
max SMD = AWHC x MAD
days between refilings   ==>  days between irrigations